Owner: Illinois Department of
Transportation
Contract Amount: Approximately
$46 Million
Location: First section begins
approximately 2.1 mile north of the Christian County Line
and extends just north of John Street in Rochester. The second
section begins 0.2 miles south of IL 104 in Taylorville and
extends on Rt. 29 approximately 1 mile south of Edinburg.
Description: This project consists of the
construction of approximately 12.30 mile of roadway improvements,
including 10 miles of a new four-lane rural expressway along
existing Illinois Route 29 from Taylorville. Additional roadway
improvements include approximately 2.0 miles of bituminous
pavement widening and overlay along existing section of IL
Rt. 29 and Il Rt. 104. This work includes construction of
full depth bituminous pavement with paved shoulders on lime
modified and aggregate subgrade, construction of pre-cast
and cast-in place box culverts, pipe culverts and storm sewer.
Construction also includes removal and replacement of two
existing bridge structures, removing and replacing guardrail
and concrete curb and gutter.
Project Overview:
320,316 Tons of Asphalt Paving
1.3 Million CY of Earth Excavation
53,113 LF of Storm Sewer
|