Owner: Illinois Department of
Transportation(Four Contracts)
Contract Amount: $171,502,981.80
Location: Our Interstate 74 Project
is made up of four sections. Section 1P, located in downtown
Peoria, begins north of Monroe Street along I-74 continuing
eastward across the Murray Baker Bridge at the Illinois River.
Section 2P follows Interstate 74 (I-74) from west of Sterling
Avenue to Nebraska Avenue. Section 3P starts in downtown Peoria
beginning at Nebraska Avenue, and continues eastward to just
north of Monroe Street along I-74. Finally, Section 4P travels
along the existing corridor of I-74 beginning just west of
the bridge over TP&W Railroad, extending easterly 2.5
kilometers (1.6 miles) to east of the Washington Street interchange
in East Peoria. The entire project covers approximately 11.596
kilometers or 7.205 miles.
Description: Section 1P includes the construction
of eastbound/westbound I-74, and ramps from just North of
Monroe Street to the Murray Baker Bridge. This section incorporates
construction of bridges, retaining walls, earthwork/grading,
drainage, concrete curb/gutter, bituminous resurfacing and
PCC pavement. Construction of a ramp tunnel and replacement
of the north approach to the Murray Baker Bridge are also
included.
Section 2P involves the reconstruction of I-74 (East Bound
Lanes) from west of Sterling Avenue to Nebraska Avenue. Construction
of interchange ramps at Sterling Avenue, and reconstruction
of ramps at War Memorial Drive. Also construction of interchange
ramps at Gale Avenue.
Section 3P includes the construction of eastbound and westbound
I-74 and associated arterial streets from north of Nebraska
Avenue to just north of Monroe Street. Also ramps which includes
the construction of retaining walls, earthwork/grading, drainage,
PCC pavement, Intelligent Transportation Systems, traffic
signals, and removal and reconstruction of six bridges.
Section 4P consists of the reconstruction of the eastbound
lanes of I-74. Improvements include bridge removal and replacement,
earth excavation, pavement/ramp removal and replacement, storm
sewer, permanent and temporary erosion control, retaining
walls, traffic signals, signing and lighting.
Project Overview:
322,206 MTons AGGREGATE SHLDS B & AGGREGATE SUBBASE
135,730 MTons BITUMINOUS SURFACE and BINDER
7,984 Each BR APPROACH PAVEMENT
25,791 SM BR DECK GROOVING
5,846 M CH LK FENCE and REMOVAL
11,156 M COMBINATION CURB & GUTTER
199,341 SM CON REINF PCC PVT 290
9,660 M CONC BAR DBL FACE MOD & SINGLE FACE
47,400 CM CONC STRUCT & CONC SUPER STRUCT
13,150 M DRILL/SET SOLDER PILE IN ROCK & SOIL
14,850 M DRIVE STL PILE
660,000 CM EARTH EXCAVATION
14,485 SM MSE WALLS
210,725 SM PCC PVT 250 JOINTED & PCC SHOULDERS 250
48,350 M PIPE UNDERDRAINS 100 & UNDERDRAINS PL
40,600 M POLYUREA PM T1 LN
41,600 CM POROUS GRAN EMBANK
399,525 KG EPOXY & PLAIN REBAR
13,200 SM SLOPE WALL 100
2,245 CM SOLDIER PILE WALL
20,750 M STORM SEWER & REMOVAL
Click on images for larger
views.
FOR MORE INFORMATION VISIT
www.upgrade74.com
|